Top Menu

Jump to content
  • VISTEON SUPPORT
    • View all projects
Home
    • Projects
    • Work packages
    • News
    • Getting started
    • Introduction video

      Welcome to OpenProject

      Get an overview

      Get a quick overview of project management and team collaboration with OpenProject.
      You can restart this video from the help menu

    • Help and support
    • Upgrade to Enterprise Edition
    • User guides
    • Videos
    • Shortcuts
    • Community forum
    • Professional support

    • Additional resources
    • Data privacy and security policy
    • OpenProject website
    • Security alerts / Newsletter
    • OpenProject blog
    • Release notes
    • Report a bug
    • Development roadmap
    • Add and edit translations
    • API documentation
  • Sign in
      Create a new account
      Forgot your password?

Side Menu

  • Overview
  • Activity
  • Roadmap
  • Work packages
  • News
  • Repository
  • Wiki
Filter

Versions

LastWeek
Unassigned
You are here:
  • Versions

Content

Roadmap

LastWeek

100% Total progress

1 closed (50%)   1 open (50%)

Related work packages
  • closedUser story #3276: New Requirement From Visteon to Seq Validation Process Discussion
  • User story #3305: PY!B High Model Implementation Support

Unassigned

75% Total progress

95 closed (62%)   57 open (38%)

Related work packages
  • Task #535: Quote Preparation for X451 and Q5 variant addition in W601
  • Task #1290: CYCLE TIME REDUCTION IN W601 EOL
  • Task #1293: FAILURE REPORT ANALYSIS - W601
  • closedTask #1294: FAILURE REPORT ANALYSIS FOR 4TH FEB BUILD
  • closedTask #1296: Sequence file edit based on failures.
  • closedTask #1301: FAILURE REPRT ANALYSIS FOR 9TH FEB BUILD
  • Task #1328: W601 BUILD SUPPORT
  • closedTask #1329: W601 90nos BUILD SUPPORT
  • closedTask #1336: March 2 W601 Build failure analysis
  • Task #1473: Check the Updated READ DTC Logs from the Cluster.
  • closedTask #1476: Support Z101 High 55 No's Build.
  • closedTask #1496: Supported Z101 build ( 60 nos)
  • closedTask #1498: W601 build support 20 nos
  • closedTask #1887: Motor Rotation Issue and Wire Gland Fixing
  • closedTask #1910: Image Blank issue in Production 1)Remove the Create Random image name in Pattern match function.
  • closedTask #1950: W601 Machine Failure Check during Wakeup condition add in the Previous Station.
  • closedTask #1971: Gland Change Trail
  • closedTask #1980: Check TATA GEN 3 Sample Software
  • closedTask #2629: Model addition ( X451 CNG )
  • closedTask #2630: Extra Telltale addition
  • closedTask #2631: vision teaching (new Variant X451 CNG)
  • closedTask #2632: X451 CNG Vision validation
  • closedTask #2643: 1 st build X451 CNG
  • closedTask #2649: Image added for manual check in X451 CNG model
  • closedTask #2677: 2 nd production X451 CNG
  • closedTask #2678: Z101 GSL and DSL Speedo and Tacho pointers new verification points addition.
  • closedTask #2679: Z101 new sequence validation
  • closedTask #2768: W601 new sequences added
  • closedTask #2770: W601 production suppport
  • closedTask #2790: Z101 Failure images checked
  • closedTask #2791: Sweep verification points range increased
  • closedTask #2817: Reverting Snap scan 2D camera power cable
  • Task #2827: ODO Reset Problem in QY CAT
  • closedTask #2840: Changing program to switch silver box
  • closedTask #2841: S237 Model addition
  • closedTask #2842: FE0E DID Addition
  • closedTask #2843: New Silver Box Wiring
  • closedTask #2844: EXE Build
  • closedTask #2845: S237 Model Validation
  • closedTask #2854: Meeting with Bala
  • closedTask #3001: Read Command FD63 Added
  • closedTask #3002: MXEE Script FD20
  • closedTask #3003: MXEE test program updated
  • closedTask #3017: Shared MXEE test result
  • closedTask #3046: System config VI and Configurable window for devices done
  • closedTask #3047: UI for Model addition + Automatic files creation
  • closedTask #3067: Adding EEPROM DID and MXEE Routine.
  • closedTask #3095: Supporting Sridar for adding New ALC in W601 EOL machine
  • closedTask #3111: PY1B LHD L7 Model Addition Discussion and Mxee Test Validation.
  • closedTask #3143: Z101 sweep delay addition
  • closedTask #3155: TATA vision eol machine hanging issue
  • closedTask #3156: correcting NI MAX
  • closedTask #3157: PXIE CAN 4 th head not working
  • closedTask #3158: PY1B LHD L7 variant added
  • closedTask #3159: Speed linited and rear fog teltale added
  • closedTask #3160: Configuration data MXEE script added
  • closedTask #3162: Monday(17-6-2024) running variants reteached and validated
  • closedTask #3163: PY1B bottom head vision
  • closedTask #3164: PY1B top head vision
  • closedTask #3165: Tuesday(18-6-2024) running variants reteached and validated
  • closedTask #3166: Wednesday(19-6-2024) running variants reteached and validated
  • closedTask #3215: Discussion regarding s220 cycle time reduction with quality team balaji
  • closedTask #3216: Lin communication issue in RBC EOL
  • closedTask #3217: MXEE test for PY1B LHD L7
  • closedTask #3233: RBC Py1b low L6 2 variant FTT improvement
  • closedTask #3280: Vertical bar display color append support
  • closedTask #3351: Serial number length reduction in RBC Machine
  • closedTask #3352: S220 Fixture receiving
  • closedTask #3353: S220 fixture Wiring work
  • closedTask #3391: Mechanical Support
  • closedTask #3400: Top Head Vision teach and Functionality check
  • closedTask #3401: Camera angle adjusted in TOP head W601 V1 machine
  • Task #3402: TATA Variant Running model Monitoring after camera adjustment
  • closedTask #3405: Mechanical Support_Barcode L clamp and PIN insert spring installed
  • Task #3409: S220 Head 3 and 4 Vision support
  • Task #3454: S220 and S237 new version silver box validation
  • closedTask #3473: Discussion regarding Np validation in W601 machine
  • closedTask #3539: RBC Customer Concern (Display line in PY1b2 MY24 HIGH variant)
  • closedTask #3639: W601 Tacho chaplet vision check (mechanical support)
  • User story #2463: VERITICAL DISPLAY VISION NOT CLEAR
  • closedUser story #2464: CLOCK TEST FAIL_S220
  • closedUser story #2467: Cluster Dowel Pin Height to be Increase
  • User story #2468: LVDS CABLE Connector Holder Placement
  • User story #2470: Ethernet Driver to be Develop for Printer
  • User story #2503: UPS Driver to be develop with running Status
  • User story #2513: Monthly FTT - Variant wise Data tracking need to be Done
  • closedUser story #2515: Variant wise tracking need to be Done
  • closedUser story #2516: Record the Vision Image
  • User story #2529: Create UI for allocating Comports
  • User story #2530: New Variant addition UI need to be develop
  • User story #2531: PXIE ON/OFF Status Message
  • closedUser story #2628: Power pin insert issue, ( making cluster to lift on one side)
  • User story #2826: QY CAT- ODO Reset Problem in BI3 SVC Model Support
  • closedUser story #2839: S237 Model Addition
  • closedUser story #3109: PY1B LHD L7 Model Addition In RBC EOL
  • closedIssue #3161: Camera frame disturbed_RBC EOL
Loading...